UNDER-FORM SCAFFOLDING

1 Taking the scaffold erection project into account, the heights and positions of the lower adjustment pins are adjusted.
2 The first row of frames is mounted on the lower adjustment shafts.
3 Cross-braces are installed on the first row of frames, and the installation of the first row is completed.
4 Scaffold connectors are installed.
5 The second row of frames is installed.
6 The pin and coupler are mounted on the scaffold connector to join the first and second rows of frames.
7 Cross-braces are installed on the second row of frames, and the installation of the second row is completed.
8 The process is repeated until the desired height for the project is reached.
9 The heights of the DYB adjustment shafts are adjusted in accordance with the scaffold erection plan.
10 Taking the scaffolding installation project into account, the main load-bearing beams are assembled according to their dimensions and overlap allowances.
11 The secondary supports are installed in accordance with the scaffolding installation plan.
12 Installation is completed with the assembly of the plywood.